Solutions

Enginuity Power Solutions has experience working with clients from all walks of life. Browse our latest projects below to get a better understanding of the type of work our team excels in, how our processes go, and the results we can generate for clients.
ABB synchronous reluctance motors and drives enable reduced carbon emissions in an energy efficient upgrade for Hobart CBD building.

ABB synchronous reluctance motors and drives enable reduced carbon emissions in an energy efficient upgrade for Hobart CBD building.

Enginuity Power Solutions was contacted by Stuart Sypkes, Director of Propery at 85 Macquarie Street, Hobart, with a goal to increase the reliability of current (aging) HVAC operations as well as reduce the energy demand, thus increasing the overall energy efficiency of the building, currently home to around 250 workers on any given day.
ABB’s technology enables Hobart Aquatic Centre to save an estimated $36,000 annually in reduced energy costs.

ABB’s technology enables Hobart Aquatic Centre to save an estimated $36,000 annually in reduced energy costs.

Commissioned in 1998, the Hobart City Council recognised that due to aging infrastructure, the energy required to heat such large volumes of water to maintain a comfortable swimming temperature year-round, was becoming unmanageable with rising costs seen not only in heating bills, but also impacting the environment.
Retrofitting Variable Speed Drives To Increase Efficiency & Reduce Environmental Impact

Retrofitting Variable Speed Drives To Increase Efficiency & Reduce Environmental Impact

Enginuity Power Solutions recently completed the installation of 2 ABB variable speed drives (VSD’s) on semi-hermetic, reciprocating compressors which were servicing a refrigeration rack in a supermarket. In just five days we have recorded a reduction of 3913.1kWh equating to a saving of $782 and 870kg of carbon dioxide!
The Indirect Result of Power Quality Analysis

The Indirect Result of Power Quality Analysis

Enginuity Power Solutions were engaged by a client who has a portfolio of property across Tasmania to assist in the development of a capital works package aimed at reducing energy consumption and lowering operation costs. A comprehensive audit was carried out of the equipment utilised throughout the site with particular attention paid to the heating, ventilation and air conditioning (HVAC) system.